SAN CRISTOBAL 2.4MW
Contract Duration:
Nov 2005 / Nov 2007Scope:
EPC: Civil & Electrical design, bulk materials supply, ocean freights and logistics, civil works and electromechanical erection of 3 x AE59 wind turbine generators, manufactured by MADE, including hybrid system with existing diesel generators. Scope included a pier expansion, access road construction, control room and buried transmission line.