Termogas Machala Combined Cycle 300MW

Bajo Alto
Ecuador

Client:

ENEX

Owner:

CELEC EP

Contract Duration:

Dec 2013 / Dec 2014

Scope:

Basic and detailed engineering for the expansion of a thermoelectric power plant that features 2x GE 6FA gas turbines running on natural gas (built by SANTOS CMI between 2001 and 2003). The project includes the installation of a thrid 6FA unit and add-on combined cycle with 3 heat recovery steam generators (HRSG) and a GE SC5 110 MW steam turbine, with air cooled condenser (ACC), two 230 kV substations and a 15 km transmission line. Contract executed in consortium with INTER RAO Engineering.