ASTORIA II 170MW
Contract Duration:
Mar 2009 / Jun 2010Scope:
Electromechanical assembly of two heat recovery boilers (HRSG), complete with pressure parts, piping pre-fabrication and erection, steam drums,structures, inlet and outlet duct, painting and thermal insulation. The HRSGs will be later on loaded onto a barge to bring them to Queens, NY to be installed behind 2 x 7FA gas turbines.