CARGUE DIRECTO 225K BPD

Barrancabermeja
Colombia

Client:

ECOPETROL

Owner:

ECOPETROL

Contract Duration:

Jan 2008 / Jun 2008

Scope:

Construction, erection, tests and commissioning of the Crude Loading Facilities Phase II. Includes: relocation of sleeper way and lines that interfere with the pipeways and pipe rack.