PUEBLO VIEJO K501
Contract Duration:
Apr 2010 / Feb 2011Scope:
Construction of pipelines from Hatillo reservoir to Hondo reservoir, tailings and reclaims. The scope includes carbon steel, HDPE and lined carbon steel piping pre fabrication and installation, all related concrete ans steel works, as well as roads construction.