JOSÉ DE ALENCAR
Contract Duration:
Sep 2010 / Sep 2011Scope:
Basic engineering for a 300 MW gas-fueled power plant set in simple cycle, composed by 3x GE LMS100 (permanent), 4x GE TM2500 (temporary) and BOP that included a gas compression station, a water treatment plant, fire protection system, compressed air, medium and low voltage distribution, instrumentation and control system. While the original contract was turn-key, project was cancelled by owner without achieving commercial operation.