LOMA DE LA LATA 180MW

Neuquén
Argentina

Client:

UTE ISOLUX TECNA

Owner:

PAMPA ENERGÍA

Contract Duration:

Apr 2008 / May 2010

Scope:

Execution of detailed and supplementary engineering for the expansion of an existing thermoelectric gas-fired power plant, now composed of 3 General Electric Frame 9E gas turbines, for which 3 HRSG will be installed together with a Siemens 180 MW gas turbine and balancing of all plant equipment and systems.