LA VEGA 90MW
Contract Duration:
Apr 2000 / Dec 2002Scope:
Complete electromechanical erection of a power plant composed of 3 x 18V48 MAN medium speed engines, auxiliaries and BOP equipment, piping, medium and low voltage systems, instrumentation and control, commissioning and start-up assistance. The company was also responsible for the EPC contract for a tank farm required to store HFO, LFO, water and lube oil.