LUISA CACERES DE ARISMENDI 70MW
Contract Duration:
Sep 1999 / Mar 2000Scope:
Civil works for a 2 x GE MS6001B (frame 6B) gas-fueled turbines for the expansion of an existing facility with 7 x MS5001B (frame 5 B). Total power output is 227 MW. Sistema Eléctrico del Estado Nueva Esparta (SENECA) owns another power plant in the Caribbean.