Tri-phase separation

Bloque 43
Ecuador

Cliente:

PETROAMAZONAS EP

Proprietário:

PETROAMAZONAS EP

Duração do contrato:

Jul 2018 / May 2019

Escopo:

Engineering, procurement and conditioning of the Tiputini early processing facilities (CPT) through the electromechanical installation of two (2) 100,000 bbls three-phase separation units to increase the processing capacity of the fluid produced in Block 43