Separators

Bloque 43
Ecuador

Client:

PETROAMAZONAS EP

Owner:

PETROAMAZONAS EP

Contract Duration:

Jul 2018 / Dec 2018

Scope:

Detailed Engineering, Procurement of Equipment and Materials, and the construction of facilities to increase the capacity of the separation system (crude-water-gas) of Block 43, through the electromechanical installation of two (2) production separators in parallel with the 2 separators existing in the Tiputini Process Station